Nottingham Academy, New Primary School
Sector: Education
Main Contractor: Carillion
M&E Contractor: Playfords
Betton Consulting were employed to produce the original design and performance specification of the new primary school building, including renewable energy analysis (resulting in the installation of a photovoltaic panel installation), as well as daylight and natural ventilation analysis. We were delighted to follow this through with the appointed mechanical and electrical sub-contractor to complete the detailed design, modelled in 3D and the aspirations of the project BIM Execution Plan.